Skip to content

Drive manufacturing efficiency and control with ERP

Transform your business with MYOB Acumatica – cloud Enterprise Resource Planning (ERP) software purpose-built for Australian manufacturers

Person in brown jacket holding white safety helmet, wearing blue button-up shirt, illuminated by purple lighting.

Remove operational complexities with the #1 ERP in Australia

More ANZ businesses choose MYOB Acumatica

Project dashboard interface showing key metrics with purple theme, displaying 49 total projects, 39 active projects, and revenue data.

Streamline manufacturing

  • Centralise systems: Connect finance, production and supply chain in one ERP

  • Automate operations: Eliminate manual processes and free up your team

  • Stay in control: Track production in real time with connected dashboards

  • Protect margins: Control costs and spot inefficiencies early

  • Simplify compliance: Maintain traceability with built-in reporting

Businesses equipped with future-fit platforms and processes grow 3x faster than their competitors.

Watch a demo

Take control of your manufacturing processes with fully integrated supply chain management. Manage resources, budgets and production schedules from a single system – reducing errors, eliminating duplicate tasks, and boosting team efficiency.

MYOB Acumatica manufacturing dashboard showing production metrics, order status charts, and cost analysis in purple interface.

Take a closer look at MYOB’s manufacturing management software

Bill of materials and routing

  • Powerful, integrated bills of materials and routing tools for precise planning and true production costs

  • Easily manage multi-level bills of materials (BOMs) with both engineering and financial views – giving you full visibility across your entire product structure

  • Allocate costs for labour, materials, tooling, and overhead, both fixed and variable – so you know your margins and make informed decisions, every time

Keep track of production order details in a single view. From the Manufacturing ERP menu, you can also find click between bill of materials, finances, inventory and more.

Production management

  • Take control of manufacturing performance and costs, every step of the way

  • Accurately capture all production costs like materials, labour, machines, tooling, overhead, and outsourced processes – so you always know your true margins

  • Optimise production schedules with flexible forward and backward planning options

  • Monitor progress in real time using detailed reports that compare actual results to plans, and drill down by cost type for sharper decision-making

Material requirements planning (MRP)

  • Stay ahead of demand and keep production running smoothly with powerful MRP tools

  • Get a clear, real-time picture of supply and demand to optimise inventory, prevent shortages, and reduce excess stock

  • Generate production and purchase orders directly from your planning screen

  • Leverage multi-level planning so every requirement is covered – ensuring consistent, uninterrupted operations

With MYOB Acumatica, you can configure new products fast, with fields like size and material. Our flexible ERP software allows you to customise product configuration flows to suit your unique manufacturing business.

Product configurator

  • Easily create and customise products to match unique customer requirements – without headaches

  • Quickly configure new orders by copying or editing existing ones, while tracking every change with in-depth revision and user history

  • Define workflows and processes for each custom build, and let the configurator automatically update costs and pricing based on selected options for precise quoting and control.

Do accurate quotes and estimates with warehouse and inventory data at your fingertips in MYOB Acumatica ERP software.

Estimating

  • Quote faster and win more jobs with accurate, flexible estimating tools

  • Build quick summary estimates or dive deep using detailed bills of material (BOMs) – then generate new quotes by copying or adapting previous estimates, BOMs, or production orders

  • Eliminate double entry with expected material, labour, and overhead costs at your fingertips, so you can confidently deliver timely, competitive pricing

Need custom solutions? We can adapt MYOB Acumatica to meet your needs now and in the future

Speak to an expert

Get to know how ERP can help your business

With a 360 degree view of budgets, compliance and projects, MYOB Acumatica helps you get real-time visibility and control of your business.

Estimate your ROI with MYOB Acumatica

Use our ROI calculator to explore potential savings, efficiency gains and long-term value for your business.

Calculate now
Mockup of an ROI calculator interface displaying estimated ROI.

Achieving global reach with MYOB Acumatica

Discover how PolyNovo saved over $10,000 and more than 60 hours per month with MYOB Acumatica Manufacturing

MYOB provides industry-leading solutions

The experts agree

Companies across Australia rely on MYOB ERP software to automate and support the growth of their businesses. 

MYOB Acumatica ERP awards in order: three badges from The Australian Business Awards — ‘ERP Innovation Winner 2024,’ ‘SaaS Innovation Winner 2023,’ and ‘Cloud Innovation Winner 2023’; followed by ‘The Cloud Awards Winner 2024-25.’ Then ‘Software Advice Front Runners 2025,’ ‘GetApp Category Leaders 2025,’ ‘Capterra Shortlist 2025,’ and ‘The SaaS Awards Winner 2024.’”

Free resources for smarter manufacturing

Unlock expert insights to help you scale, streamline, and drive efficiency in your business.

Download our practical guides – created for modern manufacturers exploring ERP.